Concealed works in a private house

Which works need to be checked before covering: foundations, reinforcement, waterproofing, insulation, electrics, plumbing and screeds.

An area of concealed works before it is covered by finishes
This illustration was created using AI and does not relate to a particular examination.

What must not be covered without checking

  • reinforcement and formwork;
  • foundation waterproofing;
  • insulation and vapour control layers;
  • building services routes;
  • electrics before walls are closed;
  • screeds and underfloor heating;
  • the roof build-up.

Expanded on 21 October 2026

Location references matter more than the number of photographs

Add views of the junction and individual details to the overall view of the area. The inventory should state the date, room, stage and corresponding drawing. Dozens of close-ups without reference points may fail to establish exactly where the work was done.

Retain the limitations of the checks

Sample-based checks and a full inspection have different limits. If part of an area is covered, inaccessible or not examined with instruments, this is recorded in the documents. A signature on a record should not create the impression that something was checked when it was not actually observed.

  • Agree the inspection time before subsequent works cover the area.
  • Check the design version against the solution actually implemented.
  • Record comments with precise locations.
  • Do not replace original photographs with an edited collage.

Once a structure is covered, the survey method is determined separately. The possibility, extent and consequences of opening up are discussed before intervention, while preserving information about the original condition.

On this subject: How to document concealed works before they are covered.

Expanded on 21 October 2026

An area of concealed works before it is covered by finishes
This illustration was created using AI and does not relate to a particular examination.

Location references matter more than the number of photographs

Add views of the junction and individual details to the overall view of the area. The inventory should state the date, room, stage and corresponding drawing. Dozens of close-ups without reference points may fail to establish exactly where the work was done.

Retain the limitations of the checks

Sample-based checks and a full inspection have different limits. If part of an area is covered, inaccessible or not examined with instruments, this is recorded in the documents. A signature on a record should not create the impression that something was checked when it was not actually observed.

  • Agree the inspection time before subsequent works cover the area.
  • Check the design version against the solution actually implemented.
  • Record comments with precise locations.
  • Do not replace original photographs with an edited collage.

Once a structure is covered, the survey method is determined separately. The possibility, extent and consequences of opening up are discussed before intervention, while preserving information about the original condition.

On this subject: How to document concealed works before they are covered.

Inquiry

Send the design, photographs of the house and the inspection brief

You can send the contractor agreement, design, cost estimate, construction photographs, concealed works records, comments, correspondence, videos of defects and the planned inspection date.

  • handover inspection of a house, cottage or townhouse;
  • construction technical supervision;
  • foundations, walls, floor structures and roofing;
  • building services and concealed works;
  • a defect schedule and photographic report.

How data is processed: Personal Data Processing Policy. Attach only materials relevant to the inspection; obscure unnecessary data about other people.

For a thorough inspection, useful materials include the design, cost estimate, contract, concealed works records, photographs of construction stages and correspondence with the contractor.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.