House handover inspection and technical supervision prices
Indicative prices. The exact price depends on the floor area, distance to the property, inspection scope, number of visits, structural complexity and report format.
| Preliminary consultation using photographs and documents | from 5 000 ₽ |
| House handover inspection | from RUB 35,000 |
| Cottage handover inspection | from RUB 40,000 |
| Townhouse handover inspection | from 30 000 ₽ |
| Handover inspection of a house from a developer | from RUB 35,000 |
| Handover inspection of a house from a contractor | from RUB 35,000 |
| Technical supervision of house construction | from 60 000 ₽/month |
| Construction quality control for individual houses | from 20 000 ₽/visit |
| Foundation inspection | from RUB 20,000 |
| Inspection of walls and floor structures | from RUB 20,000 |
| Roofing inspection | from RUB 25,000 |
| Building services inspection | from RUB 25,000 |
| Concealed works inspection | from 20 000 ₽/visit |
| House defect schedule | from RUB 20,000 |
| House handover inspection report | from RUB 15,000 |
| Repeat check of remedial work | from RUB 15,000 |
| Construction support with a schedule of visits | from RUB 15,000 |
Important: the scope and cost of work for large houses, properties outside Moscow, complex roofs, building services, basements, boiler rooms and regular technical supervision are agreed and recorded in the order before work begins.
Indicative timeframes
- Review of an expert report — at least 5 working days.
- Specialist’s opinion — at least 10 working days.
- Court-appointed examination — at least 16 working days.
- Preparation of a document based on inspection findings — at least 5 working days after the inspection.
These timeframes apply to standard assignments and begin after the order has been agreed, the complete set of materials has been received and the agreed payment conditions have been met.
Additional tests, laboratory examinations and the involvement of other specialists may extend the timeframe. The exact timeframe and scope of work are recorded in the order before work begins.
Inquiry
Send the design, photographs of the house and the inspection brief
You can send the contractor agreement, design, cost estimate, construction photographs, concealed works records, comments, correspondence, videos of defects and the planned inspection date.
- handover inspection of a house, cottage or townhouse;
- construction technical supervision;
- foundations, walls, floor structures and roofing;
- building services and concealed works;
- a defect schedule and photographic report.