Checking concealed works before covering: reinforcement, waterproofing, insulation, vapour control layers, building services routes, screeds, frames and junction details.

What is included

Checking concealed works before covering: reinforcement, waterproofing, insulation, vapour control layers, building services routes, screeds, frames and junction details.

The work is carried out by specialists with higher education in construction. The inspection covers accessible structures, rooms and building services connections, documents, design, cost estimate and photographs of construction stages.

What is checked

  • conformity of completed works with the contract, design and cost estimate;
  • visible defects in foundations, walls, floor structures, roofing and façades;
  • quality of finishes, windows, doors and junction details;
  • the condition of building services and accessible utilities;
  • the presence and completeness of concealed works records;
  • material quality according to documents and markings;
  • the need for a repeat check or remedial action on comments.

What to provide

  • the contract, design, cost estimate and technical brief;
  • completed works certificates and concealed works records;
  • photographs and videos of construction;
  • correspondence with the contractor or developer;
  • access to the basement, attic, roof and plant rooms;
  • a list of comments already known.

Pricing

from 20 000 ₽/visit. The final price depends on the house's floor area, distance, scope of work, number of visits, volume of documents and report format.

What to document before a construction detail is covered

Concealed works checks are linked to a specific stage and area of the house. Before the visit, it is useful to mark the details ready for inspection on a plan and state which subsequent operations will block access to them. A photograph of a finished room does not replace information about the structure beneath the finishes.

For each detail, select the relevant drawing or agreed solution, material information and documents recording the work performed. It is important to distinguish having a document from being able to verify its contents: a record without a clear reference to the location and work period does not allow its entry to be confidently linked to the actual area.

  • Give the area a reference: room, grid line, level or detail number on a diagram.
  • Retain an overall view before covering and close-ups of connections, joints and junctions.
  • Note which dimensions and signs were observed directly and which were taken from documents.
  • Link material markings to where the material was used, rather than keeping only a photograph of the packaging.
  • Record the comment and the area's condition after remediation before the next stage.

If works are already covered, first assess the available as-built documentation and photographs. The need for and location of opening up are determined for the specific question. A missing photograph does not automatically prove a defect, and access to one test area does not confirm that the entire structure is built in the same way.

Inquiry

Send the design, photographs of the house and the inspection brief

You can send the contractor agreement, design, cost estimate, construction photographs, concealed works records, comments, correspondence, videos of defects and the planned inspection date.

  • handover inspection of a house, cottage or townhouse;
  • construction technical supervision;
  • foundations, walls, floor structures and roofing;
  • building services and concealed works;
  • a defect schedule and photographic report.

How data is processed: Personal Data Processing Policy. Attach only materials relevant to the inspection; obscure unnecessary data about other people.

For a thorough inspection, useful materials include the design, cost estimate, contract, concealed works records, photographs of construction stages and correspondence with the contractor.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

House handover inspections and construction technical supervision by construction specialists
Write to usDiscuss your task ↗