What needs to be clarified
The task is to link the original concern, agreed remedy and accessible condition of the same location during the repeat check.
Materials to prepare
- The original numbered defect list with room references.
- Pre-repair photographs, work records and the contractor’s agreed solution.
- Documents and intermediate photographs, including elements later concealed.
What to compare
- Confirm that both records concern the same location and element.
- Compare reported actions with the original type of defect.
- Separate visible repair outcomes from matters requiring further access.
Possible outcome of the analysis
A possible result is an updated list explaining each checked item’s status and outstanding questions.
Limits of the conclusions
New finishes alone do not establish removal of the cause; opening-up and additional checks require prior agreement.