Practical guide

The contractor proposes signing off a work stage: what to check before signing the certificate

· 2 min read

Before signing off the next construction stage, it is important to compare the certificate with the actual result presented. This matters particularly if subsequent works will conceal the areas being checked. Preparation starts with a clear list of structures and the requirements agreed for them.

Clarify the scope of the stage

Compare the contract, cost estimate, design changes and the works listed in the certificate. The heading 'base preparation' may cover different operations. It is helpful to mark which areas have been presented, which are not yet ready and which actual quantities need checking before construction continues.

Collect documents before structures are covered

Request available as-built drawings, concealed works records, information about materials used and the results of checks carried out. Photographs are useful when clearly linked to a location and date. An image of an isolated detail without an overall view does not always show which part of the house it belongs to.

Distinguish comments by how they can be verified

Some signs are directly visible; others require measurements, access to documentation or a specialist in the relevant field. An unconfirmed assumption should not be recorded as an established defect. If an important area is inaccessible, this is recorded separately when defining the inspection scope.

What to prepare

  • The scope of the stage under the contract, cost estimate and latest changes.
  • A house plan marking the areas to be checked.
  • Documents on materials and completed concealed works.
  • Photographs taken before structures were covered, linked to their locations.
  • A list of comments and questions for the technical specialist.

What to bear in mind

A visual inspection does not automatically confirm every concealed parameter. The need for opening up and instrument-based checks is determined for the specific task and agreed in advance.

Outcome of preliminary preparation

Preparation results in a targeted list of checks and comments that makes it possible to discuss the actual condition of the stage, rather than just an overall impression of the construction work.

To discuss your task, provide the relevant materials and a brief description of the circumstances through the website's current enquiry channel.

Discuss the task → · All materials →
Inquiry

Send the design, photographs of the house and the inspection brief

You can send the contractor agreement, design, cost estimate, construction photographs, concealed works records, comments, correspondence, videos of defects and the planned inspection date.

  • handover inspection of a house, cottage or townhouse;
  • construction technical supervision;
  • foundations, walls, floor structures and roofing;
  • building services and concealed works;
  • a defect schedule and photographic report.

How data is processed: Personal Data Processing Policy. Attach only materials relevant to the inspection; obscure unnecessary data about other people.

For a thorough inspection, useful materials include the design, cost estimate, contract, concealed works records, photographs of construction stages and correspondence with the contractor.

Attachments: up to 10 files of up to 10 MB each, with a maximum combined size of 15 MB. If a file is rejected, the enquiry is not sent.

House handover inspections and construction technical supervision by construction specialists
Write to usDiscuss your task ↗