What needs to be clarified
Inspect accessible insulation before concealment and compare actual work with the project details and documentation for the specific façade system used.
Materials to prepare
- Façade design, details, specifications and revisions
- Board and fastener documents with batch markings
- Access to uncovered areas and staged installation photographs
What to compare
Map inspected areas; record accessible layer thickness, board fit, staggered joints and fixings. Compare bracket and opening details with the design, noting gaps, damage and moisture. Link photographs to building axes and storeys, identifying already covered areas that were not directly inspected.
Possible outcome of the analysis
A location-specific observation schedule and corrections before covering may distinguish confirmed work from areas needing additional documents or selective access.
Limits of the conclusions
Overview photographs do not establish concealed fasteners or every layer's thickness. An accessible sample cannot automatically represent the whole façade or replace design calculations.