Can the house be checked before signing the certificate?
Yes, agree the date and access with the seller or contractor; the brief determines the checklist.
Will you find every defect?
Discovery of concealed shortcomings cannot be guaranteed without access, opening up or specialised tests.
How long does an inspection take?
It depends on the floor area, level of completion, types of structures and available documents; the timeframe is stated in the order.
Can I receive a report on paper?
Yes, the paper or electronic format is agreed before the work is carried out.
How do I unsubscribe from the mailing list?
Use the link in the advertising email or the separate unsubscribe page.